Web Copyright:Dezhou Success Tanks Co., Ltd 鲁ICP备19001924号-1 By:www.300.cn
QUICK LINK
CONTACT US
Mail: sales@successtanks.com
Phone: +86 13305341134
Wechat: 86 13305341134
WhatsApp: 86 13305341134
Facebook: 13305341134
SHARE
Glassfiber water tank for irrigation and farm using
Dezhou Success Tanks Co., Ltd is a reliable water tank manufacturer with 19 years experience. We are located in Dezhou City with convenient transportation access. Our main products include: grp/smc/frp water tank, steel water tank and stainless steel water tank, and all which have passed WRAS and ISO approval.
SMC Water Tank is made of fiberglass reinforced plastics which is divided into FRP modular type and SMC combination type. The major advantage is light weight, anti-rusted, non-leakage, long durable time and easy to clean. It is widely used in hotel, school, hospital and coal mine enterprise.
SMC water tank combined with the SMC molding panel, sealing materials, metal structure and piping system to onsite assemble together. We can assemble water tanks with 0.125m3~125,00m3 according to your need.
The specifications of the SMC water tank were proven to be in conformity with National industrial standards of construction materials
Application:
▲ Residential building (drinking water).
▲ School water supply.
▲ Commercial use: restaurant, hotel, etc.
▲ Agricultural feeding water storage.
▲ Water circulation system.
▲ Construction and fire-fighting water supply.
For installation, we can provide installation guide: installation video or installation assistance on site by our engineers.
If parts are damaged within the quality insurance period because of quality fault, we will change the damaged parts free of charge.
STEP-BY-STEP ASSEMBLY
TANKS FROM 1 TO 10,000M3 (260 – 2,500,000 USG)
Despite its’ great strength, GRP is lightweight – just 1/3 one third the weight of an equivalent steel panel. All panels can be lifted by hand, with no special equipment required even where access is difficult, and installation can progress quickly and efficiently.
Step 1. Install steel footings on leveled concrete foundations.
Step 2. Align GRP panels to be pre-assembled.
Step 3. Place rubber sealant from ready-to-use roll between panels.
Step 4. Connect panels with bolts and nuts.
Step 5. Position bottom panel sections, and finish up base of tank.
Step 6. Position three sides of the tank.
Step 7. Position and fix roof panels and if required, roof support pipes and plates.
Step 8. Install reinforcement if required.
Step 9. Close up the tank with the fourth side.
Step 10. Finish the internal or external reinforcement.
Step 11. Fill and test.